Mixed-Use Campus Arena District Study

Add To Collection
Image
Client

Confidential Campus

Location

United States of America

Image

Led by Marquee Development, the project team carried out this master planning and architecture study for a major academic campus. The 16 acre site was examined under a strategic land planning exercise to determine options for a major campus corner.

Add To Collection
Image

The team’s concept was to anchor the site at the gateway corner with a 6,000 seat sports arena, complemented by a 175 key boutique hotel, 250 residences, a 100,000 square foot office building, and a 400 bay parking structure. The key elements of the site’s program were arranging around a signature open space that would serve as an everyday “front yard” for the local community, and as a game-day activity zone. Retail and community program elements facing the interior open space add to ground-level activation. Pedestrian connectivity through the site from key abutting nodes is strongly privileged, as is a car-free environment at the site’s heart.

plan

Image
Image
Image

Project Team

SCB (Master Planning)

Manica (Arena)

OJB Landscape Architecture (Landscape Architect)